Connect Electric installed system consisting of 486 panels

Connect Electric have recently installed a 121.5 kW system consisting of 486 panels. The installation was carried out on a factory roof in London and took 10 days to complete.
IMG_0615IMG_0518IMG_0854

 

IMG_0511IMG_0549IMG_0867IMG_0515IMG_0550IMG_0503IMG_0519IMG_0525IMG_0513IMG_0615

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>